Thursday, December 1, 2011
Acura GSR, Impetigo instructions Acura end
To remove
1. make it easy for the gas pressure in the system by spreads the brightness banjo at the top of the fuel filter. Disconnect the fuel rail fuel line. It is recommended that you replace the washers. Break the chain of fuel, unbolt the harness. Disconnect the fuel pressure regulator hoses (FPR).
2. disconnect throttle body fuel hose/pipe. Disconnect all hoses leading to ? and throttle Impetigo. Disconnect closes throttle cable throttle cable throttle body and face. Disconnect the cable throttle position sensor (TPS), throttle body map sensor.3. two lower bolts that secure block manifold Impetigo unbolt engine. This still use Willl close to accommodate the bypass pipe of the Sun. Unbolt manifold block engine. Remove throttle body, fuel manifold train whole.
4. remove the bypass air consumption (IAB) vacuum tank, check the solenoid valves and control unit. Design of your new manifold, can no longer use those parts. Do not remove-FPR. This is used in the process of re-Hose installation with.
5. from the throttle body Unbolt manifold. Check the gasket and replace if necessary. I open throttle body from the vastir manifold bolts. Remove fuel rail Assembly manifold.
6. original unbolt and remove miriaa, the air control valve on (IAC), the air intake valve temperature (IAT) and o-rings. Replace o-rings if necessary. Remove the original manifold fuel rail bolts.
Assembly
1. screw bolts, bolts throttle body fuel rail removed the original manifold into manifold power + plus new.
2. throttle body Bolt the new manifold. When you place the throttle body gasket, u-shaped part is in the upper-left corner of the vastir.
3. lightning active control valve, a valve air temperature of air ????????? with o-rings on the manifold. Install fuel rail, make sure o rings placed correctly to prevent fuel leakage.
4. place a new train the body Assembly with Impetigo and fuel throttling back on the cylinder head bolts, make sure the gasket of new consumption positioned correctly. A member of the EVAP purge solenoid valve control. Due to design new, there are no ????????? Impetigo Assembly position for solenoid valve control EVAP purge. It can be a zip-tied in a secure location. 1994-' 95 vehicles, one at the end of the hose is a member of Rimon coal, other Member-end of match small Orange located back of the vacuum manifold ????????? new. 1996-01 vehicles. See notes below.
5. Bolt holding the harness of the fuel injector, hoses, connect the harness injectors. A member of the TPS, map sensor and fuel. About FPR will fit a small manifold vacuum was originally at the front but is now back. Banjo bolt tightening the fuel filter.
6. use a new throttle cable bracket supplied to throttle cable throttle body connected to stock.
7. connect the battery and replace cooling system. And cancel all unused empty tubes with vacuum letters.
8. start the engine, check for leaks. After temperature, turn off the engine was brought and test each bulletin are tight. Retighten bolts Impetigo after 500.